Home > Searched NO. >

Triple rail-to-rail CMOS operational amplifier, 2.7-5.5V, SOIC-14

Brand:

Package:

SOIC-14 (8.65 x 3.9 mm)
In stock:
7686pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
PNP general purpose transistor, -45V, -500mA, SOT-23-3

Brand:

Package:

SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
3150pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
NPN Darlington power transistor, 80V, 8A, 60W, TO-220

Brand:

Package:

TO-220-3 (10.54 x 4.69 mm, through-hole)
In stock:
11660pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel enhancement MOSFET, 25V, 0.22A, SOT-23-3

Brand:

Package:

SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
9880pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
NPN general purpose transistor, 45V, 500mA, hFE 100-250, SOT-23-3

Brand:

Package:

SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
9847pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
NPN digital transistor with built-in bias resistors, SOT-23-3

Brand:

Package:

SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
12842pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Single 2-input AND gate, 1.65-5.5V, SC-70-5

Brand:

Package:

SC-70-5 / SOT-353-5 (2.1 x 1.25 x 0.95 mm, P5 package)
In stock:
9299pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
P-Channel enhancement MOSFET, -30V, -1.7A, 80mOhm, SuperSOT-3

Brand:

Package:

SuperSOT-3 / SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
8991pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
N-Channel enhancement MOSFET, 30V, 2.2A, 42mOhm, SuperSOT-3

Brand:

Package:

SuperSOT-3 / SOT-23-3 (2.9 x 1.3 x 1.0 mm)
In stock:
6740pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry
Current-limited power distribution switch, 2.5A, adjustable, flip-chip

Brand:

Package:

Flip-Chip-6 (1.7 x 1.5 x 0.55 mm, HSN package)
In stock:
6725pcs

Cargo cycle: 3~7 Days
The minimum order is 1

Go to Inquiry

Online Inquiry Form

Support Excel, PDF, CSV format files for full BOM list quotation

Submit your component procurement and custom packaging needs via the form below. We will provide a detailed quotation and professional solution within 1–8 working hours.